Editor's note: in November 2019, the solar power grid, the grid stake & other; Two rules & throughout; Commissioning results photovoltaic notice, China solar power network, the total inspection fee and total compensation fee of 3018 respectively. 20000 yuan, 2828. 20000 yuan.
Inner Mongolia electric power ( Group) Co. , LTD. , the direct stake grid power plants, new energy enterprises:
in the north China energy regulatory bureau of Inner Mongolia by the letter committee concerning the implementation of Inner Mongolia power grid power plant auxiliary services management and detailed rules for the implementation of the parallel operation management notice '( North China can monitor market [2014] no. 699) ( Hereinafter referred to as & other; Two rules & throughout; ) The energy regulatory bureau about print and distribute in Inner Mongolia, north China power grid new energy & other; Two rules & throughout; ( Trial) Notice ( North China can monitor market [2019] no. 122) And other documents required, solar panels, stake grid power control center completed the stake grid power generation enterprises in November 2019 & other; Two rules & throughout; Commissioning results calculation and statistical work. On December 30, 2019, Inner Mongolia electric power ( Group) A limited liability company to inform the November 2019 & other; Two rules & throughout; List the operation result. Relevant information will now be notified as follows.
a, direct stake grid unit
in November 2019, stake grid direct regulating & other; Two rules & throughout; Assessment of total cost and total compensation cost of 3018 respectively. 20000 yuan, 2828. 20000 yuan.
2, stake grid wind farms
the wind farms in November 2019, the total cost is 2887. 310000 yuan.
3, stake grid photovoltaic power station
the photovoltaic power station in November 2019, the total cost is 425. 680000 yuan.
nzte has carried on the review to these results. So far, power generation company has been on the result of the dispute or complaint report. In accordance with the relevant provisions, the solar energy equipment, presently for direct stake in November 2019 power plants, for every wind farms and photovoltaic power station auxiliary services and grid assessment results to be published.
please Inner Mongolia electric power ( Group) Limited liability company on the basis of documents, timely settlement of various power generation enterprise in November 2019 & other Two rules & throughout; Fees.
the original title: energy regulatory bureau released about stake of north China power grid in November 2019 & other; Two rules & throughout; Test results of notice, Chinese solar power network