New energy investment exceeds 262. 3 billion yuan in the first half of the 19 gw pv projects + three gorges, huadian, national electrical leads, 870 mw! Its Chinese xinjiang released across states, City) Photovoltaic (pv) given (2020 The first) And 10. 5 mw released in 2020 in guangdong power grid in photovoltaic grid was put into the fourth batch of project
solar photovoltaic network statement: this information is reproduced from the media or other Internet web site, network cooperation solar portal, solar photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. The article content is for reference only.
this paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Among them, the EPC project owner units is given priority to with soe/state, this also reflected from the side, solar energy, in project bidding and parity, the state-owned enterprises have become the absolute main force. In particular, solar portal, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group of people for 200 mw, 190 mw hubei energy group, huaneng 180 mw
, photovoltaic (pv) grid, solar power