Surcharges for end users have to pay VAT ( 19%) Residents, polysilicon workshop work how users pay the surcharge to 8. 04 euro cents/KWH ( In the yuan 0. 62 yuan/KWH) 。 As of December 2019, solar energy, heat storage what Germany EEG account balances to 20. A 100 million euro ( In December 2018, 45. 400 million euros) 。 In 2020, the EEG surcharge as 6. 76 euro cents/KWH. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Among them, the photovoltaic components EPC project owners, all units is given priority to with soe/state, this also reflected from the side, in project bidding and parity, state-owned enterprises have become the absolute main force.
in particular, CGNPC 603 mw heat storage device, polysilicon workshop how to work in guangzhou development of 410 mw, 345 mw in energy saving, jin group, 220 mw, in power stations in the people throw 200 mw, 190 mw in power plant of hubei energy group, custom cabinets back fixed 180 mw photovoltaic pv all components huaneng network statement: this information is reproduced from the power grid cooperation media or other Internet website, solar energy, solar panels, solar photovoltaic (pv) network published the article for the purpose of the information, solar portal, custom cabinets back fixed does not mean that agree with his point of view or confirm its description. Compared with 2018, the decline is mainly due to the electric power market prices and reduce electricity consumption to lower income. Solar photovoltaic (pv) net news: German renewable energy surcharge ( EEG) Source of funds is assumed by the electric power consumers do not belong to the tax planning. The article content is for reference only.
, solar power network in China