On August 18,
morning, according to reports, tong wei's stake in subsidiary of polycrystalline silicon solar panels in leshan wutongqiao district, a once-in-a-century flooding, currently and leshan in sichuan province has launched a flood control and emergency response, polysilicon company in accordance with the requirements of the local government emergency management agency has the emergency shutdown, all parking equipment safety, production time depends on the flood and subsequent influence. It is understood that the local water level continues to rise.
it is understood that the current polysilicon is grappling with flood control work, the factory district current production capacity of 20000 tons.
also understands from sichuan to observe, previously, in polysilicon wutongqiao has set up a working group to add into the enterprises flood prevention work. On August 17 0:53 reported polysilicon river is
slow decline.