Expects its annual output is expected to more than 2. 7 gw. Specifically, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group the people vote for 200 mw, 190 mw hubei energy group, huaneng 180 mw in recent years, the country in many photovoltaic system built on the Swiss plateau, but don't effectively solve the problem of electricity in winter. Swissolar managing director David Stickelberger said: & other; Every year we need 40 to 45 tw of solar energy, most of them can rely on roofs and walls project are met. The plant is expected to achieve high power level, especially in the winter. Network monitoring solution offer content are for reference only. Photovoltaic application scenario, the researchers claim that solar power network, this system can help alleviate the winter because of the fog, it's cloudy and solar radiation levels caused by the seasonal power decline. Axpo Swiss enterprises want to nearly 2500 meters above sea level in Muttsee reservoir dam wall to build a 2 mw power plant, to prove the conclusion. Solar photovoltaic net news: in baden utilities Axpo is Switzerland gamla Ruth state ( 格拉鲁斯) Muttsee reservoir construction of a capacity of 2 megawatts of electricity generation!
Switzerland in winter consumption of electricity is far more than its capacity. Photovoltaic stents w Swiss electricity supplier Romande Energie in the Swiss Alps recently, the photovoltaic (pv) grid, photovoltaic application scenario, 1810 meters above sea level the Thule lake ( Lac des Toules) The lake built a 448 kilowatts of floating solar array. But the Axpo thinks, high altitude photovoltaic system is expected to support for the Swiss government making energy strategy in 2050. Among them, the EPC project owner units is given priority to with soe/state, this also reflected from the side, in project bidding and parity, the state-owned enterprises have become the absolute main force. Of course, to really change the status quo, light Muttsee dam on a power plant is not enough. ” Swissolar the photovoltaic industry association said this week that solar pv project their own needs to 50 gigawatts of cumulative pv capacity can satisfy the future demand for electricity, and in the process of phasing out nuclear power to replace fossil fuels. ” According to the company, the plant will include about 6000 components, solar panels, deployed in the area of about 10000 square meters. In addition to the double component to the advantage of more power generation in the snow outside, these components also has higher efficiency in low temperature. High altitude project has several advantages, the cold end heat exchanger hot end of the cold end heat exchanger no fog is one of the hot end, photovoltaic stents w because the sunny sky means more solar radiation. This would be a solar energy demand for digital of installed solar capacity of 25 times so far. Is expected by the company, the whole system would be in the winter the annual output of about half & ndash; — Than in relatively flat lowlands position, similar to the size of the power plant winter only about a quarter of all the year round. Sutter think the location is ideal, because the dam facing south, photovoltaic (pv) grid, and connected to the grid. As Switzerland and other countries a number of large power plants began to off-grid, winter power purchase foreseeable in the coming years will become increasingly difficult. He claimed that the altitude is also a factor promoting solar power. Our pv projects must be deployed in does not belong to protected areas, and have been properly developed position. Company also added that depend on the component array tilt Angle of 77 degrees, at the bottom of the component adopts 51 degrees slope array. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. The company also plans to the project submitted to the Swiss federal energy bureau as an innovation project. Axpo revealed that are still in discussions with potential partners according to the long-term power purchase agreement to realize the possibility of purchasing power. But also must satisfy the prerequisite of political and economic aspects.
has several studies show that the solar energy, built in the mountains of photovoltaic system even in the winter can make a lot of energy. The Swiss federal institute of forest, snow and landscape ( WSL) Arm & ndash; — The snow and avalanche research institute ( SLF) And the federal institute of technology in lausanne, Switzerland, the latest research highlights the potential of alpine photovoltaic system. The company power generation and power grid, head of Andy Heiz said: & other; We found that the photovoltaic power generation facilities indeed can produce a lot of energy. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, does not mean that agree with the point of view or confirm the description?