The article content is for reference only. According to Albania's energy minister, solar power network, there are more than 20 international companies involved in the country near the southwestern city of Fier Karavasta area construction, maintenance and operation of a 140 mw photovoltaic power plant bidding. Specifically, CGNPC 603 mw, guangzhou development of 410 mw, 345 mw in energy saving, 3 mm chest back can jin group of 220 mw, solar energy, solar panels, chip key materials dual-machine backup server software people to vote in 200 mw, 190 mw hubei energy group, huaneng power in January, 180 mw photovoltaic pv system product department launched the project bidding, photovoltaic stents for March 16, the deadline of the bid how much solar panels a Karavasta tender attracted a lot of interest in Europe and other parts of large enterprises, but the minister did not disclose more information. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. Among them, the photovoltaic stents EPC project owner units is given priority to with soe/state, this also reflected from the side, in the project bidding and parity, solar photovoltaic, solar energy, state-owned enterprises have become the absolute main force. North Macedonia ESM state-owned power company recently released its 100 mw ( 50MW*2) The public bidding of photovoltaic power station, the server software dual-machine backup total investment is expected to reach $87. 2 million.