National electric power investment group co. , LTD. Hubei branch ( The new energy sector) Two annual mass (for the second batch of two 499. 37 mw photovoltaic power station site operation maintenance) A tender announcement
( 1) The bidder should be in the People's Republic of China in accordance with the company law of the People's Republic of China, with independent legal person status registered enterprises, photovoltaic (pv) grid, as legal taxpayer.
( 2) There is no major safety accident nearly three years, or does not exist in nearly three years twice or more bigger safety accidents, or not there is a big safety accident in nearly a year.
( 4) To be mutual restriction for the same project ( Such as supervision and supervision) The relationship between the blocks, the unit head for the same person or there is a controlling relationship of different units may not in the same project bid and bid accordingly.
( 5) The bidder has qualified effective ISO9000 series quality system ( Quality assurance system or equivalent) , ISO14000 environmental management system ( Environmental management system or equivalent) , OHSAS18000 occupation health and safety management system ( Occupational health and safety management system or equivalent) Authentication certificate.
( 10) Contractor nearly three years without due to collusion, fraud, bribery, interacting, or fraud and other illegal or serious misconduct by the owner to cancel its bid qualification;
( 11) In recent three years is not defraud the bid, serious violations and for own reasons that any contract be lifted, China solar power network, and the government administrative departments, state power investment group co. , LTD. ( Including the CLP group co. , LTD. ) Suspend or cancel the bidding qualification.
solar photovoltaic network statement: this information is reproduced from the power grid cooperation media or other Internet website, solar photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. The article content is for reference only.
this paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Among them, the EPC project owner units is given priority to with soe/state, this also reflected from the side, in project bidding and parity, the solar power grid, solar panels, state-owned enterprises have become the absolute main force. Specifically, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group in the solar energy, the people vote for 200 mw, 190 mw hubei energy group, huaneng 180 mw
the national power investment group, two annual mass (for the second batch of two 499. 37 mw photovoltaic power station site operation maintenance) Tender announcement
Shanghai cut pv subsidy: 2020, 2021 and put into operation down to 1/3, 2/3 & other; 630' Grid enjoy subsidies in 2019 before
promote solar and other clean energy given! The fujian province electric power load auxiliary services trading rules ( Trial) ( Revised in 2020) 'Notice