loading

 sales@gsl-energy.com     0086 13923720280

Longji can hand in hand to Beijing! Ningxia 'double hundred' base

With a total area of 300 square kilometers, investment of 30 billion yuan of ningxia wuzhong city sun mountain of new energy bases, solar panels, become the country's leading wind power and photovoltaic installed two 1 million kw & other; Double hundred & throughout; Base, bring the realization of the new energy landscape scenery complementary demonstration effect. The article content is for reference only. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. , said an official with the Beijing can be related to solar portal, longji single crystal components have the advantages of high power gain, high reliability, considering the long term benefits, can effectively reduce the degree of electricity costs, solar portal, and in the cooperation, longji can respond quickly, is very good partner. Dancing with wind heat storage device by giant impeller, pieces of solar panels day by day. The outstanding performance of the longji timely delivery, reliable service for Beijing to group recognition and commendation. Specifically, CGNPC 603 mw in hot domestic software development, guangzhou, 410 mw photovoltaic application of new energy saving 220 mw, 345 mw, jin can group of people of 200 mw, hubei energy group, 190 mw, 180 mw huaneng Beijing sun mountain 180 mw photovoltaic bidding projects with a total investment of 7. 200 million yuan, covers an area of 5595 mu, how much is the electric furnace of high carbon ferromanganese bid the project B 92 megawatts by longji clean energy construction, adopted to longji Hi MO4 single component, do diagonal skills with 3125 kw centralized inverter cabinet boxes all-in-one. Ningxia wuzhong city sun mountain of new energy bases as & other; Double hundred & throughout; Base, in promoting the development of new energy scale and diversification development of our country has important significance on solar panels, and longji efficient single crystal component in the successful application of the project, for the new energy system's efficiency and comprehensive development play a positive role, also helped clean development of energy structure. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. Beijing energy group co. , LTD. ( Hereinafter referred to as & other; Beijing can group & throughout; ) 180 mw photovoltaic bidding project is located in ningxia Wu Zhongxin energy base, of which the Hi - 92 mw adopted longji supplies MO4 components, the application of high power component, but also for the whole set the typical new energy base highlyeffective, WanShanHua. Beijing can group has always been on longji efficient products, solar glass in datong, a leader and a third group of leading longji is adopted in several projects, such as single crystal components products. It is understood that in the process of the project cooperation, established & other longji on the one hand; Full cover, strictly implement, pragmatic & throughout; Quality control network, hot domestic software on the other hand, actively coordinate production capacity to ensure timely delivery of the project, 77 days to complete full capacity installation debugging. Photovoltaic new applications of the EPC project owner units is given priority to with soe/state, this also reflected from the side, in project bidding and parity, the state-owned enterprises has become the absolute main force. Ningxia wuzhong city sun mountain in the solar radiation is more than 6 billion kilojoules per square meter, desert, semi-desert area of the surface properties and the advantages for the development of new energy provides a rich. The project adopts the longji Hi - MO4 components, compared to conventional polycrystalline power station system, the Hi - MO4 single crystal components BOS cost savings. 21 yuan/tile, combined with the power generation and more attenuation per year on average less than 0. 55% of advantage, solar panels, how much is the electric furnace of high carbon ferromanganese KWH cost dropped significantly, reliable performance in practical applications are also fully verified. The project starts in October 10, after 77 days of hard work, on December 25, a booster station master success sending, again a exciting & other; Longji speed & throughout; ?

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Blogpost
Enhanced Energy Reliability: 928kWh Energy Storage System Installed in Panama
Introducing GSL Energy's latest innovation in energy storage: a 928kWh system installed in Panama, designed for reliability and flexibility in commercial and industrial settings. With features like grid-connected and off-grid operation, outdoor waterproof design, and high durability, businesses can count on continuous power supply, cost savings, and sustainability. Contact GSL Energy today for more information on this cutting-edge solution!
GSL ENERGY 32KVA Hybrid Inverter 40KWH Lifepo4 Battery Storage System in Philippines
Date: Jan 12, 2023

Location: Philippines

Application: Solar hybrid Home system

Config : 40KWH POWERWALL lithium battery

Purpose : Solar home storage

Inverter : 32kva Off grid hybrid Inverter

Energy Source : 40kwh/ GSL PV solar Panel system
GSL ENERGY 80KVA Hybrid Inverter 140KWH Lifepo4 Battery Storage System in Lebanon
Date: Feb 10, 2023

Location: Lebanon

Application: Solar hybrid Home system

Config: 140KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 80kva Off grid hybrid Inverter

Energy Source: 140kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 30KWH Lifepo4 Battery Storage System
Date: Feb 23, 2023

Location: Jamaica

Application: Solar hybrid Home system

Config: 30KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 30kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 30KWH Lifepo4 Battery Storage System in Ruerto rico
Date: Mar 20, 2023

Location: Ruerto rico

Application: Solar hybrid Home system

Config: 30KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 30kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 20KWH Lifepo4 Battery Storage System in USA
Date: Mar 21, 2023

Location: USA

Application: Solar hybrid Home system

Config: 20KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 20kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 20KWH Lifepo4 Battery Storage System in Jamaica
Date: Mar 22, 2023

Location: Jamaica

Application: Solar hybrid Home system

Config: 20KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 20kwh/ GSL PV solar Panel system
GSL ENERGY 24KVA Hybrid Inverter 40KWH Lifepo4 Battery Storage System Nigeria
Date: Mar 26, 2023

Location: Nigeria

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
GSL ENERGY 5KVA Off Grid Inverter 40KWH Lifepo4 Battery Storage System in USA
Date: Apr 08, 2023

Location: USA

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
GSL ENERGY 20KVA Off Grid Inverter 60KWH Lifepo4 Battery Storage System in USA
Date: Apr 09, 2023

Location: USA

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Contact us
whatsapp
contact customer service
Contact us
whatsapp
cancel
Customer service
detect