loading

 sales@gsl-energy.com     0086 13923720280

Inner Mongolia stone Gao ha river town north village collective economic competitive consultations tender announcement pv projects

Solar photovoltaic webex: zhong an engineering project management co. , LTD bayinnaoer city of Inner Mongolia branch by region banner stone ha river town people's government, is region banner stone ha river town Gao north village collective economic pv projects, using competitive negotiations, solar power network, has developed the bidding conditions, welcome to conform to the qualifications of the suppliers to sign up for.

3, have issued by the construction administration department of electric power engineering construction general contracting level 3 ( Including three level) And above qualifications of enterprises; And in such aspects as personnel, equipment, capital has the ability to undertake the project construction;

4, plans to send the project manager must have a mechanical and electrical engineering level 2 and above registered construction of the professional qualification and effective safety class B the inspection certificate of quality;

5, bidders in & other; Credit throughout China &; Website ( ) Is listed as disciplinary object with serious breach of wage arrears for migrant rural workers subject list shall not participate in the project bidding; In & other; National enterprise credit information publicity system & throughout; ( ) In serious illegal faithless companies list of bidders, shall not participate in bidding;

3, when signing up, please provide the following documents copies of the original and build official seal in quadruplicate ( Use A4 paper plastic loaded into) 。 Check the original copy of retained build official seal.

  ( 3) To open an account licence; According to the People's Bank of China on the pilot cancellation notice issued by the companies bank account opening permit ( Silver hair [2018] no. 125) For no longer basic account opening permit issued by the pilot areas of bidders can not provide basic account opening permit, but should provide pilot area branch of the people's bank of the record filing materials, solar equipment, record filing materials in basic account information (the bidder should be reflected the real Including account name, account number, bank name, etc. ) ;

  ( 5) Provide in May 2019 to April 2020 for six months lawfully pay taxes ( Value added tax, corporate income tax) Documents and does not occur in provide zero tax return credential certificate;

  ( 8) Original of enterprise legal person accredit a power of attorney, enterprise as a legal person id photocopy, and the client id original and photocopy, project manager, safety assessment of builders registration certificate;

  ( 10) Provide China judicial documents online query since July 2017 and its legal representative, bidders to appoint the project manager of no bribery crime record related web page screenshots.

this consultation announcement in the bayinnaoer city ( Regional flag county) The government procurement network '( ) , the Inner Mongolia autonomous region government procurement network ( ) Above the media release, other media forwarding is invalid.

solar photovoltaic network statement: this information is reproduced from the power grid cooperation media or other Internet website, solar energy, solar photovoltaic (pv) network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. The article content is for reference only.

this paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Among them, the EPC project owner units is given priority to with soe/state, photovoltaic (pv) grid, this also reflected from the side, the solar energy portal, in project bidding and parity, the state-owned enterprises have become the absolute main force. Specifically, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group the people vote for 200 mw, 190 mw hubei energy group, huaneng power 180 mw

GET IN TOUCH WITH Us
recommended articles
SERVICE INFO CENTER Blogpost
Enhanced Energy Reliability: 928kWh Energy Storage System Installed in Panama
Introducing GSL Energy's latest innovation in energy storage: a 928kWh system installed in Panama, designed for reliability and flexibility in commercial and industrial settings. With features like grid-connected and off-grid operation, outdoor waterproof design, and high durability, businesses can count on continuous power supply, cost savings, and sustainability. Contact GSL Energy today for more information on this cutting-edge solution!
GSL ENERGY 32KVA Hybrid Inverter 40KWH Lifepo4 Battery Storage System in Philippines
Date: Jan 12, 2023

Location: Philippines

Application: Solar hybrid Home system

Config : 40KWH POWERWALL lithium battery

Purpose : Solar home storage

Inverter : 32kva Off grid hybrid Inverter

Energy Source : 40kwh/ GSL PV solar Panel system
GSL ENERGY 80KVA Hybrid Inverter 140KWH Lifepo4 Battery Storage System in Lebanon
Date: Feb 10, 2023

Location: Lebanon

Application: Solar hybrid Home system

Config: 140KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 80kva Off grid hybrid Inverter

Energy Source: 140kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 30KWH Lifepo4 Battery Storage System
Date: Feb 23, 2023

Location: Jamaica

Application: Solar hybrid Home system

Config: 30KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 30kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 30KWH Lifepo4 Battery Storage System in Ruerto rico
Date: Mar 20, 2023

Location: Ruerto rico

Application: Solar hybrid Home system

Config: 30KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 30kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 20KWH Lifepo4 Battery Storage System in USA
Date: Mar 21, 2023

Location: USA

Application: Solar hybrid Home system

Config: 20KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 20kwh/ GSL PV solar Panel system
GSL ENERGY 8KVA Hybrid Inverter 20KWH Lifepo4 Battery Storage System in Jamaica
Date: Mar 22, 2023

Location: Jamaica

Application: Solar hybrid Home system

Config: 20KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 8kva Off grid hybrid Inverter

Energy Source: 20kwh/ GSL PV solar Panel system
GSL ENERGY 24KVA Hybrid Inverter 40KWH Lifepo4 Battery Storage System Nigeria
Date: Mar 26, 2023

Location: Nigeria

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
GSL ENERGY 5KVA Off Grid Inverter 40KWH Lifepo4 Battery Storage System in USA
Date: Apr 08, 2023

Location: USA

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
GSL ENERGY 20KVA Off Grid Inverter 60KWH Lifepo4 Battery Storage System in USA
Date: Apr 09, 2023

Location: USA

Application: Solar hybrid Home system

Config: 40KWH POWERWALL lithium battery

Purpose: Solar home storage

Inverter: 24kva Off grid hybrid Inverter

Energy Source: 40kwh/ GSL PV solar Panel system
no data
 Service Tel: +86-755-84515360
 Address: A602, Tianan Cyber Park, Huangge North Road, Longgang District, Shenzhen, China
GSL ENERGY - A leader of green energy provider in china since 2011

0086 13923720280

Contact us
whatsapp
contact customer service
Contact us
whatsapp
cancel
Customer service
detect