Among them, the EPC project owner units is given priority to with soe/state, this also reflected from the side, in project bidding and parity, the state-owned enterprises have become the absolute main force. Even equipped with heating function, prevent the road is icy. The bottom, the use of the damp proof effect, to avoid moisture in the land below, protect middle circuit. Solar photovoltaic (pv) network statement: this information is reproduced from the power grid cooperation media or other Internet website, garbage incineration power plant project of solar energy photovoltaic network published the article for the purpose of the information, China solar energy network, does not mean that agree with his point of view or confirm its description. No benefits and no profit, this project also naturally went bankrupt. France solar road failure does not mean that in the future related research will end, in fact also spend a lot of money to study in the United States. But it actually, this kind of solar panels, were not as effective as the protection of the principle diagram of the monitoring project to install solar controller in France in the use of solar road, just two years time, bear the heavy traffic, a lot of solar panels appear loose and broken surface, most of the damage is beyond repair, the costly project had to be pulled down. Waste incineration power plant project some roads also installed some leds, in the case of poor road light up, used as road signs. In the middle of the cell layer is used to generate electricity. Specifically, CGNPC 603 mw, 410 mw power generation project of guangzhou development light, the energy saving of 220 mw, 345 mw, jin can group the people vote for 200 mw, 190 mw hubei energy group, huaneng 180 mw this solar road plate is not so simple as it seems, is actually composed of three different kinds of materials, solar portal, the top has the protection function, transparent material with good load effect in protecting the road surface is also easy to let the sun to reach the middle of the solar cell layer, the top design is not smooth, and can ensure that will not slide when cars drive on it, in the rainy day can also let the rain run out as soon as possible, will not affect the travel of pedestrians and vehicles. In 2016, France the world's first solar panels highway construction and named walter, solar panels, solar power network in China, it is composed of 2800 pieces of photovoltaic panels, each board is width 30 cm of small squares, like floor tile shop is on the road. Currently, the use of green energy for energy saving and efficient production activities more and more important, hope that through further research and experiment chest plate thickness, we can make good use of sustainable resources as soon as possible, use them to benefit mankind!
and not the repair of actually is not only a project, the project is a nuisance, resin coating has strong enough in time, but chest plate thickness on the heavy traffic produces a lot of noise, local residents have called for a 70 km per hour speed limit road. Although they are small but cost is too high for polysilicon cost up to $7000 per piece, the cost of the 1 km of road up to $5. 2 million. A began to calculation, the annual production of 150000 kilowatt-hours of electricity to operate is also backfired, 2018 less than 8 KWH electricity, in July 2019 is less than 40000 KWH. Want to get this with the beginning gains are huge, even some do more harm than good. Control department according to the environment and energy calculation, solar panels, the length of 1 km highway capable of supporting a has 5000 users of small towns in daily public lighting electricity, and you can also to traffic signal lamp, road charging power supply, can even sending electricity to households. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. The article content is for reference only.