Solar photovoltaic webex: qinghai solar off-grid power generation how many money? Pv now like mushrooms staged installation boom between the urban and rural, indeed in the moment looking at others at no cost to electricity, solar energy photovoltaic stents still make money, so sad, mood. according but not all users are suited for the photovoltaic system, depends on your roof optimum is not suitable for installation of pv system depends on the area of the roof, roof load, toward the objective factors, such as, of course, also consider the return on investment. In the countryside, we often see generally divided into flat roof and the roof of sloping roof, flat roof bearing than sloping roof bearing capacity is big, but can flat roof installation of photovoltaic power station capacity is smaller than sloping roof, at the time of installation must be thoughtful. In distributed photovoltaic power generation project, factory installed capacity in dozens of mw and above, the capacity for the factory users basic question is not big, solar equipment, usually take up area per kw covers an area of about 10 square meters. Specifically, CGNPC in development of 410 mw, 603 mw, guangzhou energy saving 220 mw, 345 mw, jin can group the people vote for 200 mw, 190 mw hubei energy group, huaneng 180 mw many friends don't know how to calculate for photovoltaic power plant investment, actually said to calculate pv system investment situation, just make sure the capacity of the photovoltaic system can be roughly calculate the investment. Photovoltaic (pv) said today on and everybody said solar off-grid power installed capacity in qinghai, and price. The user after the installation of photovoltaic (pv) grid system, you can enjoy the national subsidies, solar power grid, the incentives are paid by the country's renewable energy development fund, and the power grid enterprises turn to pay. Silicon material information such as 3 kw photovoltaic system, basic in 21000 - the market price 24000 yuan between, 3 kw per day can be 10 several electric power generation, return cycle in 6 - probably 7 years. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information.
grid normally will record the owner of the bank card number, on a regular basis to the bank card subsidies, subsidies limitation in some places for three months, or half a year, intelligent photovoltaic modules have issued once a year, time may be long and short but will send, so users don't have to worry about. So subsidies income from the grid to the owner, system engineering intelligent photovoltaic modules specific execution time around a little different. Photovoltaic modules installed in qinghai solar off-grid power connector is not you have such a roof area can be installed, but also look toward the roof, roof load silicon material information. Photovoltaic modules connector at present the country has subsidy for photovoltaic power generation, some regional and local subsidies, and the service life of pv systems - in 20 years 25 years, solar equipment, 6 - 7 years back after this, the rest of all is not gain that is 10 years. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, solar energy, does not mean that agree with his point of view or confirm its description. In both the flat roof or inclined roof before installation, must measure the distance between the components, ensure that components between left and right sides, do not block each other, before and after the surrounding vegetation, building there is no shade, guarantee capacity. Among them, the EPC project owner units is given priority to with soe/state, China solar power network, this also reflected from the side, in project bidding and parity, the state-owned enterprises has become the absolute main force! Environmental protection new energy project content are for reference only. 3 kw pv system investment 20000 yuan, the short term price is not friendly, but in the long run is still worth considering.