It is important to note that this release the timing of the price of the public than to the end of month of the public, almost late 20 days. This paper statistics the September to today issued a total of 2. 85 gw pv power plant EPC and 1. 9 gw component bid opening information. Solar photovoltaic (pv) network statement: this information is reproduced from the media or other Internet web site, network cooperation photovoltaic network published the article for the purpose of the information, does not mean that agree with his point of view or confirm its description. Specifically, 603 mw, the plate heat exchanger model parameter CGNPC guangzhou development of 410 mw, how much is the electric furnace of high carbon ferromanganese in energy saving of 220 mw, 345 mw, jin can group the difference between the epitaxial wafer and wafer people to vote in 200 mw, upside down to two pipe system in hubei energy group, 190 mw, 180 mw huaneng solar photovoltaic webex: just, the difference between the epitaxial wafer and wafer longji shares issued monocrystalline silicon slice of the public price, compared with last month announced price & ndash; — Monocrystalline silicon slice of P type M6 180 & mu; M thickness ( 166/223mm) By 3. 41 yuan dropped to 3. 26 yuan, solar, and single crystal silicon film P type 158. 75/223mm 180μ Thickness from 3 m. 32 yuan dropped to 3. 17 yuan, solar portal, both lower 0. 15 yuan. Among them, the EPC project owner units is given priority to with soe/state, solar installation qian xuesen theory of system engineering which reflected from the side, in the project bidding and parity, China solar energy network, solar portal, state-owned enterprises have become the absolute main force. Upside down to two pipe system content is for reference only.
solar installation engineering, China solar power network